Logistics park, 6th of October City
A GC used Oblix as the single progress record across three warehouse phases and cut weekly reporting from a day to an hour.
Sample entry: live case study pending
- Client
- -
- Location
- 6th of October City, Egypt
- Building type
- Industrial, logistics and warehousing
- Scope
- Civil, steel structure and MEP, 3 phases, 120,000 m²

Capture record
- 120,000 m²
- Site area tracked
- 3
- Phases in parallel
- 118
- Capture walks
- 9 months
- Continuous coverage
This is a sample entry. It demonstrates the project template at full quality; replace the client, imagery, and figures with a real engagement before launch.
The situation
Three warehouse phases ran in parallel with different subcontractors and one planning engineer. Assembling the weekly progress report meant a day of chasing photos, marking up plans, and reconciling claims from three site offices.
What Oblix did
Each phase was captured on a fixed weekly route. Oblix tied the imagery to the programme, generated progress summaries per zone, and kept one dashboard for the GC and the owner’s engineer, so both sides worked from the same numbers and pictures instead of separate versions.
What changed
- The weekly report became an export instead of a day of work.
- Steel erection slippage in Phase 2 was flagged from capture comparisons three weeks before it hit the critical path.
- The owner’s engineer reviewed works remotely between formal site visits.